Thursday, May 10, 2007

Gas sampling

May 1, 2007

Collected samples in all sites.


With Lindsey and Phil

Wednesday, April 18, 2007

Ground water sampling

April 17, 2006

Collected groundwater samples in Ron Risdal North and South sites.


With Jessica.






Friday, April 13, 2007

Gas sampling

April 13, 2007

Collected gas samples in all sites.

With Phil and Lindsey

Saturday, April 07, 2007

Gas sampling

April 5, 2007

Collected gas samples in all sites.

Soil moisture meter was out of order, so we could not measure soil moisture in RCF.





With Lindsey, Phil and Bryan

Monday, April 02, 2007

Gas sampling

March 29, 2007

Collected gas samples in all sites.

With Phil, Bryan and Lindsey

Intact soil core sampling and N mineralization experiment

March 3, 2007

Collected intact soil cores in all sites.

Pulled out old buried bags in the sites and buried new soil bags in RWG, RWB, RCG and RCF.

Conducted inorganic-N extractoion experiment.


With Phil

Saturday, March 24, 2007

Gas sampling and changed a sensor in RCF

March 22, 2007

Collected gas samples in all sites.

Changed soil temperature sensor in the crop field.

The soil temperature sensor is needed to repair (the sensor is detecting wrong temperature).



With Lindsey, Bryan and Phil



Wednesday, March 21, 2007

Groundwater sampling for dissolved N2O gas

March 21, 2007

Collected groundwater to analyze dissolved N2O in the water in North and South of Ron Risdal site.

With Jessica

Saturday, March 17, 2007

Gas sampling

March 15, 2007


Gas sampling in RWG, RWB, RCG, and RCF.



With Nathan








Gas sampling

March 13, 2007

Collected gas samples all sites but JWB and JWG.


Wtih Liegh Ann and Nathan

Gas sampling

March 13, 2007

Collected gas samples all sites but JWB and JWG.


Wtih Liegh Ann and Nathan

Friday, March 09, 2007

Gas sampling

Feb. 08, 2007

Gas sampling all sites

With Phil and Grant







Wednesday, February 28, 2007

Gas sampling

Feb. 27, 2007

Gas sampling all sites.

* All sites were covered by snow.

* LWG site: skipped no.2 and no.4 points samplings owing to lack of gas chambers

* RCF site: snow was covered, however, soil under snow was thawed (see below the third figure)

With Phil and Grant





Tuesday, February 20, 2007

Gas sampling on snow surface and anchors

Feb. 20, 2007

Collected gas samples in all sites (sampling on snow surface; on anchors).

Snow is melting and soil is thawing.

Found available sites for harvesting study; 1 plot beside LWB and 2 plots beside JWG.


With Phil and Grant





Friday, February 16, 2007

Gas sampling

Feb. 15, 2007
Collected gas smaples in all sites (chmabers on snow).
With Phil, Brayn and Lindsey








Tuesday, January 30, 2007

Gas sampling

Jan. 30, 2007

Collected gas samples in all sites (chambers on snow method).

With Grant and Phil.





Thursday, January 25, 2007

Ground water sampling to analyse dissolved N2O

Jan. 25, 2007

Collected ground water sampling in North and South Ron Risdal sites

with Jess




Gas sampling

Jan. 23, 2007

Collected gas sampling in all sites

with Phil and Grant







Friday, December 29, 2006

Changed a rain guage data logger etc.

December 29, 2006

Changed the data logger of rain guage in Ron Risdal site.



Downloaded data from RWB, RWG, RCG and RCF.

Soil temperature sensor of RCF is needed to be changed.


With Lindsey

Wednesday, December 27, 2006

Gas sampling

December 27th, 2006

Collected gas samples in all sites.
The first anchor of RCG site had ice inside. Check gas flux data of the anchor (see 2nd below photo).

With Lindsey and Phil